Domestic Hot Water (DHW)
Gas Valve Timing
An EBS interface board
is installed adjacent to the hot water heater. A U.L. listed pressure
switch is installed at the hot water heater gas valve. Sensor wires
are attached to the pressure switch to read “on” time for the gas
valve. “On” time data is transmitted via the on board Transmitter,
Repeaters, Receiver and to the Central Unit. The Receiver and Central
unit, typically installed in the clubhouse, decodes transmissions
from the Receiver and stores the meter readings for retrieval by
Energy Billing Systems, Inc's billing computer.
